Free cleaning template

Cleaning client onboarding process for commercial sites

This procedure walks a small commercial cleaning business from the initial site visit through to the post-first-clean follow-up call, covering quoting, contracts, access, risk notes, scheduling and team briefing. It is designed for operations managers, site surveyors and shift supervisors in teams of up to 50 staff.

11 steps Operations manager, Site surveyor, Account coordinator, Shift supervisor 3-5 working days For every new commercial cleaning client
A cleaning company owner walking through an office with the client

Process flowchart

Yes

No

Start

Done

Walk the site and take photos

Document scope, rooms and frequency

Prepare and send the quote

Has the client accepted the quote and confirmed start date?

Log the declined quote and close the file

Finalise contract and payment terms

Collect access details, keys or codes

Complete site risk notes

Build the schedule and assign staff

Brief the team before the first visit

Carry out the first clean

Make the follow-up call after first clean

Operations managerSite surveyorAccount coordinatorShift supervisor

Step-by-step procedure

What you need

  • Laser measure or tape measure
  • Phone or camera for photos
  • Quoting spreadsheet or template
  • Contract and terms template
  • Key cabinet, lockbox or coded fob holder
  • Risk assessment form (one per site)
  • Rota / schedule sheet
  • Clipboard, pens, room labels
  1. 1

    Walk the site and take photos Site surveyor

    Visit the client's premises during normal working hours so you can see the space in use. Walk every floor, corridor, stairwell, WC, kitchen/break area, storage room and any outdoor area included in the scope. Take a photo of each room from the doorway facing inward. Note the number of occupants per shift, any areas with restricted access, and whether the client wants cleaning before open, after close, or overnight. Measure floor areas roughly (laser measure is fastest) so the quote reflects real square metres rather than a guess.

  2. 2

    Document scope, rooms and frequency Site surveyor

    Back at the office (or on a tablet on site), fill in the site survey sheet. List each room or zone by name, floor area, tasks required (vacuum, mop, dust, sanitise WCs, empty bins, kitchen degrease, window sills, etc.) and how often. Mark one-off items separately from recurring ones. Flag anything unusual: delicate finishes, server rooms with no water use, areas with sharps or biohazard risk, or spaces where a lone worker will be present after hours. Attach the photo set to the file so the quoting team can review without re-visiting.

  3. 3

    Prepare and send the quote Operations manager

    Build the quote from the survey sheet. Price each zone by task and frequency, add any one-off deep-clean line (carpet extraction, high-level dusting, window cleaning) as a separate item so the client can see what is recurring versus set-up. Include your standard terms: notice period for cancellation, payment window, who provides consumables if applicable, and whether you supply equipment or use the client's. Send the quote with a short cover note summarising scope and frequency in plain language. Set a follow-up date in your calendar for three working days after sending.

  4. Has the client accepted the quote and confirmed start date? Operations manager

  5. 4

    Log the declined quote and close the file Operations manager only if needed

    Record the outcome in your CRM or client ledger: date quoted, amount offered, reason for decline if the client shared one (price, chose another provider, project cancelled). If the reason is price and the gap is small, note whether a revised quote is worth offering before closing. File the survey sheet and photos so you do not re-walk the site if they come back later. Remove any calendar reminders tied to this opportunity.

  6. 5

    Finalise contract and payment terms Operations manager only if needed

    Convert the accepted quote into your standard service agreement. Confirm the start date, the exact list of tasks per zone (attach the survey sheet as an appendix), frequency, response times for queries or missed cleans, and the notice period either party must give before ending the contract. Agree invoicing: monthly in advance or arrears, payment method, and what happens if a payment is late. Have both parties sign electronically or return a scanned copy. Keep one signed copy in the client file and one in your records folder. Check your local rules on how long you must retain contract records.

  7. 6

    Collect access details, keys or codes Account coordinator only if needed

    Arrange a handover with the client's facilities or reception contact. Collect keys, fobs, PIN codes or access cards for every door the team will need. Log each item in your key register: site, door, key/fob number, holder, date issued. If the client uses an app-based system (e.g. a digital lock), ask them to add your shift supervisor as an authorised user and confirm the method in writing. Store physical keys in the cabinet or lockbox at your office, labelled with a code rather than the client's name or address. Never write PIN codes on paper that leaves the building; pass them verbally or via your secure channel.

  8. 7

    Complete site risk notes Site surveyor only if needed

    Fill in the one-page risk note for this specific site. List hazards the team will encounter: wet floors after mopping (slip risk), electrical equipment near water, chemicals stored on site, lone-working hours, client staff present during the clean, restricted zones (server rooms, labs, construction areas), and any PPE the client requires beyond your standard kit. Note emergency exits, first-aid location, and who to call in an incident. Keep it practical: two or three lines per hazard, not a textbook. The shift supervisor reads this before every first visit to a new site.

  9. 8

    Build the schedule and assign staff Operations manager only if needed

    Add the new site to your rota. Assign a lead cleaner (or pair, if the site is large or has overnight hours) and a backup. Set the start time so the team arrives before the client's first occupants arrive, or at the agreed window if it is an after-hours contract. Note travel time between zones if the site spans multiple buildings. Print or push the schedule to the assigned cleaners with the room task list, frequency, access instructions and risk note attached. Confirm the assignment by phone or message so each cleaner knows which day is their first.

  10. 9

    Brief the team before the first visit Shift supervisor only if needed

    Hold a 10-15 minute briefing the evening before or morning of the first clean, in person at the depot or by phone. Walk through: site address and parking, how to get in (key, code, who to contact if locked out), which rooms are in scope versus off-limits, task order (top-down: dust high shelves, wipe surfaces, vacuum/mop floors last), what equipment you bring versus what the client provides, where to store keys while working, and what to do if a room is locked. Hand out the printed task list and risk note. Let them ask questions before they leave.

  11. 10

    Carry out the first clean Shift supervisor only if needed

    The shift supervisor (or senior cleaner) must be on site for the first visit. Work through every zone on the task list in order, top-down per room. Take photos of each area before and after so you have a baseline. Note anything that differs from the survey: an extra bin, a locked cupboard, a surface needing different treatment, a missing supply. If you find a hazard not on the risk note (loose carpet edge, exposed cable), stop, make it safe if you can, and flag it to the operations manager before leaving. Lock up, return keys to the cabinet, and complete the job sheet with start/finish times and issues.

  12. 11

    Make the follow-up call after first clean Account coordinator only if needed

    Call the client's contact within 24 hours of the first completed clean. Confirm they are happy with the standard, ask whether anything was missed or done differently, and listen for adjustments (e.g. 'we need the kitchen deeper on Fridays'). Note any changes in the client file and update the task list before the next visit. Ask if anyone else on site should be looped in. Close by confirming the next clean date and time so both sides are aligned. If the client raises a serious issue (missed room, damage), escalate to the operations manager the same day rather than promising a fix you have not arranged.

Checklist

About this procedure

Onboarding a new commercial client is where many cleaning businesses lose money or damage their reputation in the first month. Rooms get missed, frequencies are misunderstood, keys go missing, and the team walks in without knowing which floors use wet-mop versus dry-vac. A structured onboarding process removes those gaps before the first clean happens.

This SOP covers the full arc: walking the site, agreeing scope and frequency, quoting, contracting, collecting access, logging risk notes, building the rota, briefing the crew, running the first clean and making a follow-up call. Each step names the person responsible so nothing falls between roles.

Adapt the templates, field lists and timing to match your own service area and client mix. The sequence is the same whether you are taking on a two-floor office or a 2,000 square metre warehouse; only the detail changes.

Tips and common mistakes

Photograph before you quote

A photo set from the site visit prevents the most common quoting error: assuming a corridor or storage room is in scope when it is not. Label each photo with the room name and floor so the quoting team can cross-reference without re-reading handwritten notes.

One access contact per site

Ask the client to name a single point of contact for keys, codes and after-hours entry. If that person changes jobs, you want one phone call to update your file rather than chasing three different reception desks.

First clean is never solo

Even if the schedule shows two cleaners, the shift supervisor should be on site for the first visit. You are learning the layout in real time and the team may hit a locked door, an unfamiliar machine or a client request that needs an immediate decision.

Keep the risk note to one page

If the hazard list runs to two pages, no cleaner will read it before starting. Two or three lines per hazard, in plain language, with the control action stated ('wear gloves', 'report to supervisor before entering') is enough.

How to adapt this template

  • Replace the generic task list with your own standard room types (open-plan office, canteen, warehouse racking, lab bench) and the specific products or methods you use for each.
  • Adjust the follow-up call timing if your contracts are weekly versus daily; a daily-clean client may need a same-day check rather than 24 hours.
  • Add or remove zones in the risk note template to match the sectors you serve (medical, food production, logistics) and the PPE your team actually carries.
  • Set your own quote validity period (e.g. 14 days) and notice period for termination in the contract template so the SOP matches what you actually sign off.
  • Decide whether consumables (detergents, paper towels, bin liners) are supplied by you or the client, and make that explicit on the survey sheet and quote so there is no day-one argument about who buys the mop heads.

Laws and rules differ per country and region. Where a step depends on them, check what applies to your business before you use the procedure.

Frequently asked questions

How soon after signing the contract should the first clean happen?

Aim for within five working days of a signed contract, longer if you need to source specific equipment or chemicals for the site. Tell the client the confirmed date at contract stage so they can plan around it (e.g. moving stock out of a warehouse zone before your team starts).

What if the client wants to add rooms or change frequency after onboarding?

Treat any scope change as a small re-onboarding step: update the survey sheet, adjust the quote pro-rata, note the change in the contract appendix, and re-brief the assigned team. Do not let a verbal 'just add the fifth floor' slip in without a written confirmation both sides have seen.

Who is responsible if a key or fob goes missing?

Your contract should state what happens when an access item is lost (replacement cost, re-keying fee) and who reports it. Log the loss in your key register the same day it is noticed. Check your local rules or adviser on any reporting obligations if the key gives access to secure areas.

Should the client be present during the first clean?

It helps but is not essential. If a facilities manager can walk the team through the site for 15 minutes before they start, do it. If not, make sure your briefing (the evening-before or morning call) covers parking, entry method and any quirks so the team is not standing at the door wondering where to begin.